-A test conducted at the vendor’s premises to verify that the system, equipment or utility, as assembled or partially assembled, meets expected specifications.
-The purpose of the FAT is the provide document evidence that the equipment is verified at the vendor site before it installed.
-Prior to installation of
the equipment shall be confirmed to comply with URS at the vendor site if
applicable.
-Equipment is constructed
as per the customer’s requirement or not, Safety assessment shall be done
before installation.
-If
it can be shown that the functionality is not affected by the transport and installation.
-FAT
may be supplemented by the execution of a SAT following the receipt of equipment
at the manufacturing site.
-FAT
Protocol shall be include following contents:
Purpose
Scope
Procedure
Following
point need to be checked in FAT:
Design
as per the requirement
MOC
Major
components
Electrical
connection
Critical
Parameters (Functional Test)
Other
accessories
Any
software if available
Documents
(Drawing, manual)